Prospecting Methods and Scope of Works
01.10.09 est.
- Detailed 2D seismic survey, 611 line-km (2003).
- Complementary 2D CDP detailed survey, 110 line-km (2004).
- Geological & engineering surveys to install SEFDR (2004-2005):
- drilling of exploratory wells (7 EW - 281 running meters);
- bathymetric, hydrolocation, hydromagnetic soundings (600 line-km);
- high-resolution seismic (HRS - 74 line-km).
- Engineering-ecological and geochemical studies (2004):
- water sampling (60 stations) and sea-bed soil sampling (130 stations);
- geochemical survey (130 samples);
- hydro sounding;
- side-looking sonar (530 line-km).
- Engineering-hydrometeorological survey (2004) - 1 station.
- Detailed 2-D seismic, 110 line-km (2004).
- Ecological and fishery researches (2005).
- Hydro-gas survey, 830 line-km (2004, 2007).
- Electrical prospecting, 200 line-km (2007).
- Basin model investigations of the Russian sector of Sea of Azov (2007).
- Quasi 3D reprocessing of 2D seismic survey, 100 sq. km. (2009).
- Ecological monitoring of water area of the block
is held annually in spring and in autumn seasons (2009).