Prospecting Methods and Scope of Works
01.10.09 est.
- 600 line-km of gravity surveys (2003).
- 600 line-km of magnetic surveys (2003).
- Detailed seismic survey 2D, 1140 line-km (2003).
- Geological & engineering surveys to install SEFDR (2004):
- drilling of exploratory wells (18 EW - 574 running meters);
- bathymetric, hydrolocation, hydromagnetic soundings (1188 line-km);
- high-resolution seismic (HRS - 157 line-km).
- Ecological-geochemical studies based on sea-bed soils - 92 stations (2003).
- Engineering and ecological studies of sea-bed sediments and water (134 stations) (2003), 5300 line-km of acoustic profiling (2003).
- Ecologic seasonal monitoring of sea-bed sediments and sea water - 5 stations (2004).
- Engineering hydrometeorological studies - 1 station (2004).
- Organic matter examinations in core samples from engineering wells (EW) (2004).
- Ecological and fishery researches (2006).
- Hydro-gas survey, 900 line-km (2003, 2007).
- Electrical prospecting, 200 line-km (2007).
- Study of formation samples of cores from wells of water area of Sea of Azov (2007).
- Quasi 3D reprocessing of 2D seismic survey, 250 sq. km. (2009).
- Ecological monitoring of water area of the block is held annually in spring and in autumn seasons (2009).